[Example] Drying the construction site
A case where a building affected by winter water damage was rapidly dried using a modular system installed in four buildings.
We would like to introduce a case where Ashcourt Group implemented a modular mobile heater and a 30kVA generator. At the company's construction site, winter weather caused damage to the interiors, leading to delays and difficulties for the workers. To address this, they installed equipment that combined a 125kW heater with ducts connected to a 30kVA generator. To minimize the installation area, it was connected to a 1,000-liter fuel tank. As a result, they were able to overcome the adverse winter weather and adhere to the project schedule. [Challenges] - There were delays in the construction schedule for four student dormitories. - Winter weather caused damage to the interiors. *For more details, please download the PDF or feel free to contact us.